• Skip to primary navigation
  • Skip to main content
  • Skip to footer

TSX-V: TM | FRA: TZU2 | OTCQB: PNTZF

Trigon Metals

Trigon Metals

Exploring Copper and Silver in Africa’s Best Jurisdictions

  • Home
  • Corporate
  • Assets
    • Addana Project
    • Silver Hill Project
    • Kalahari Copper Project
  • Investors
    • Overview
    • Stock Information
    • Corporate Presentation
    • Financial Documents
  • News & Press Releases
  • Contact
    • facebook
    • twitter
    • instagram
    • linkedin
    • youtube

trigonmetals

PDF Download

Trigon Metals Reports Second Quarter Operating and Financial Results

2 December 2024 by trigonmetals

Toronto, Ontario (December 2, 2024) – Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) (“Trigon” or the “Company”) announces its operating and financial results for the three months ended September 30, 2024. Shareholders and interested parties are invited to join a conference call hosted by Trigon management, tomorrow, Tuesday, December 3, 2024, at 11:00 a.m. Eastern time to discuss the results. Dial-in details for the call can be found near the end of this press release. All amounts are expressed in U.S. dollars, unless otherwise stated.

Highlights

  • Achieved a key milestone at the Kombat Mine having mined an average of 980 tonnes of ore per day from underground operations over 30 days.   The Company’s streaming agreement with Sprott Private Resource Streaming and Royalty (B) Corp. and Sprott Mining Inc. includes a term requiring the Company to achieve average production of 900 tonnes per day from underground operations over 30 consecutive days by October 31, 2025. Trigon achieved this target 13 months earlier than contractually required.
  • Second quarter copper production was 2,137,159 pounds at C1 cash costs(1) of $3.46 per pound of copper produced.
  • Silver production during the quarter was 33,852 ounces
  • Negative Adjusted EBITDA (1) of $1.4 million.   EBITDA was negatively impacted by pump failure during the quarter, lower grades and higher lead content.

Rennie Morkel, President and COO of Trigon, commented, “While this quarter presented some operational challenges, we are proud to have achieved a critical milestone by reaching our underground production target of 900 tonnes per day at the Kombat Mine, well ahead of schedule. This accomplishment de-risks the project and protects our balance sheet, positioning us for stronger performance moving forward.”

Jed Richardson, CEO and Executive Chairman of Trigon, commented, “As we optimize underground operations and plan for mill expansion, we remain confident in our ability to unlock the full potential of the Kombat Mine and deliver value. The Company is exploring strategic options to sufficiently capitalize the operation and limit dilution for shareholders.”

Mining & Milling Operations

Open pit ore contributed significantly to production in Q2, lowering the overall grade going into the mill. This was compounded by delays in accessing higher-grade portions in the mine as dewatering was slowed.

The Company’s decision to pause its open pit mining activities (see press release dated September 19, 2024) came into effect at the beginning of Q2, allowing Trigon to focus on mining and milling higher grades from underground, owing to the following factors:

  1. The successful recommissioning of the underground mine with commercial production declared on April 30, 2024,
  2. Ability to mine 900 tonnes per day average over a 30 day period,

3.      The significant grade differential and positive contribution of the underground mining operations when compared to the open pit operations

Current constraints on milling capacity at the Kombat Mine limit plant throughput to 1,000 tonnes per day, which leads to the preferential feeding of higher-grade underground ore. The Company can fill any production shortfall by feeding existing lower-grade stockpiles until underground production reaches full steady state.

Table 1: Operating and Financial Highlights (Reported in USD)

  Three Months EndedThree Months Ended
  September 30, 2024June 30,2024
 MINING  
 OP Ore Mined (tonnes)46,115 29,715
 OP Copper Grade %1.15%  1.23%          
 OP Silver Grade (g/t)2.839.98 
 UG Ore Mined (tonnes)69,917  57,070          
 UG Copper Grade1.79%  2.05%          
 UG Silver Grade (g/t)20.2911.44 
 Total Ore Mined (tonnes)116,032          86,785  
    
 MILLING  
 Ore Processed (tonnes)77,295          70,483  
 Copper recovery (%)92.1%          88.3%  
 Copper Concentrate Production (tonnes)4,2143,876            
 Concentrate Grade (Cu %)21.2%   27.1%         
 Concentrate Grade (Ag g/t)260          271  
 Copper Product Produced (tonnes)969          1,045  
 Copper Product Produced (lbs)2,137,159          2,302,726  
 Silver Product Produced (oz)33,852 33,399          
    
 SALES  
 Copper Concentrate Sold (dry metric tonnes)4,547 4,596           
 Copper Concentrate Sold (lbs)10,024,407          10,132,434  
 Copper Product Sold (tonnes)961          968  
 Copper Product Sold (lbs)2,118,640          2,134,072  
 Realized copper price (per lb) $       3.25           $4.18  
 C1 cash cost/lb (100% payability) (1) $       3.46             3.23  
   
 FINANCIAL HIGHLIGHTS ($ in 000’s, except per share amounts) 
 Revenues     $7,164               $10,032    
 Gross Profit      $(2,201)          $ 1,941        
 EBITDA   $(2,732)           $654          
 Adjusted EBITDA$(1,436)$1,800
 Cash flow from operations     $1,986           $70        
 Net (loss) income     $(6,903)         $(2,215)         
        
 Three Months EndedThree Months Ended
 September 30, 2024September 30, 2024
Net (loss) income attributable to shareholders of the Company $(6,242)$(2,108)
      Per share (basic)     $(0.16)         $(0.05)          
    Per share (diluted)   $(0.16)  $(0.05)          
Cash, cash equivalents and short-term investments$909          $1,173

OP = Open Pit

UG = Underground

(1)EBITDA, net income (loss) attributable to owners of the Company, income (loss) per share attributable to owners of the Company, net (cash), working capital, C1 cash cost, copper production are non-IFRS measures. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company’s discussion of Non-IFRS measures in its Management Discussion and Analysis for the three months ended June 30, 2024.

Lead Penalties

The lower than expected realized copper price was the result of high lead penalties on the shipped concentrate. Changes to the mine plan to compensate for pumping delays led to mining ore with higher lead in the upper portions of the mine. The high lead content in much of the shipped copper concentrates resulted in high penalties, which are deducted from the net smelter revenue and reflected in the lower than expected realized price. Towards the end of the quarter, an extra flotation capacity was used to float off some of the lead in what is best described as a rougher concentrate with high lead and some copper. This has yet to be separated into a saleable product and is collecting in the lead circuit thickeners. Fortunately, mining has moved deeper in the mine and away from the high lead areas, and lead penalties are not expected to be a problem going forward.

Exploration Update

Trigon is allocating $2.5 million to $3.5 million to exploration programs for reserve and resource replacement and on other exploration prospects in and around Kombat’s existing infrastructure and landholdings in the Kombat Valley.

On August 29, 2024, Trigon announced the results of drilling from the new zone identified in the vicinity of Shaft #3 of the Kombat Mine. These areas are outside the proven and probable mine reserves estimates published in March 2024. Mineralization in these areas was initially detected in surface drilling in 2023 and some historic drill work dating back to when Goldfields operated the mine. The holes classified as follow-up have yielded positive results and are outlined below. Total volumes and tonnage for a mineral resource estimate have yet to be quantified. At present, drilling is spaced to define a mineral resource estimate in the indicated mineral resource category. Trigon continues its underground drilling operations, with approximately 3,500 meters planned by year-end.

Drilling Results Overview:

  • E600-017: 3.32% Cu over 7 metres
  • E600-018: 2.08% Cu over 4 metres
  • E600-044: 2.65% Cu over 3 metres
  • E600-045: 2.48% Cu over 3 metres
  • E600-047: 2.14% Cu over 5 metres
  • E600-055: 2.61% Cu over 2 metres
  • E600-056: 2.06% Cu over 2 metres
  • E600-065: 2.21% Cu over 4 metres

The Company is focused on expanding its reserves and mine plan at Shaft #3  at the Kombat Mine as it opens up more working faces in an area with untapped extraction capacity.   Currently, all ore is being extracted from the decline ramp adjacent to Shaft #1, which limits the Company to 1,000 tpd. Bringing in new ore from the second unused decline at Shaft #3 is expected to enable Trigon to ramp up extraction to support plant throughput moving from 1,000 tpd to 2,000 tpd next year.

Furthermore, the Trigon exploration team is working to better understand and subsequently better predict the mineralization in the footwall/dolomites. Apart from the well-understood mineralization along the steep contact between the phyllites and the dolomites, the geology team encounters high-grade mineralization in the dolomites only, and away from the contact where most resources and reserves occur. Once better understood, the exploration and mining geology team aims to better predict these areas and find additional mineralization underground.

Plant Expansion

Full-year capital expenditures for the fiscal year ended March 31, 2025 are funding dependent and are projected to range from $10 million to $11 million. The capital expenditure guidance assumes an exchange rate of 18 NAD per 1 USD.  

Trigon plans to expand the mill’s throughput from 30,000 tonnes per month to 60,000 tonnes per month to cater for additional material from the underground operations.   Management believes the additional tonnage from the underground operations will lower operating costs and amplify profitability.

2025 Production and Cost Guidance

Following second quarter operating performance at the Kombat Mine, the Company is revising down its 2025 copper production guidance from 12,125,000 to 13,448,000 pounds of copper to 8,315,000 to 9,250,000. The Company has also reduced its expected mined and processed copper grades to between 1.52% to 1.79%.

The Company’s updated cost guidance for 2024 assumes a foreign exchange rate of 18 NAD per USD silver price of $30 per ounce and a copper price of $4.33 per pound.

Table 2: Financial Year 2025 Guidance

  FY 2025 Guidance
DescriptionUnitFloorCeiling
Underground MiningTonnes250,000280,000
Ore Grade%1.52%1.79%
ProcessingTonnes       260,000312,000
Copper ProducedTonnes           3,7704,200
Copper Producedlbs  8,315,0009,250,000
Cash Cost$/lbs             3.453.15

Conference Call Details

The Company will hold a conference call to discuss these results on Tuesday, December 3, 2024 at 11:00 a.m. EST (8:00 a.m. PST). Please pre-register at the link provided below.

Date: Tuesday, December 3, 2024

Time: 11:00 a.m. EST/8:00 a.m. PST

Dial in: Canada/USA: 1-800-990-4333

Toronto: 1-289 514-5000

New York: 1-646-769-9600

please dial in 5-10 minutes prior and ask to join the call

Pre-Register:

Registration link: https://emportal.ink/3B4LXEX

Replay: Canada/USA toll-free: 1-888-660-6264

Replay Passcode: 99483#

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101. 

Trigon Metals Inc.

Trigon is a publicly-traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine.

Cautionary Notes  

This news release may contain forward-looking statements. These statements include statements regarding the Company’s mining operations, the financial results of the Company, the timing and results of mining activities, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Kombat mine, the economic viability of the Kombat mine, the Company’s ability to obtain financing, the Company’s ability to expand or replace mineral resources and reserves, the projected costs and production at the Kombat mine, planned capital expenditures, the prices of copper and silver, foreign currency exchange rates, and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Filed Under: 2024

Trigon Metals Inc. to Attend 121 Mining Investment Conference in Dubai

15 November 2024 by trigonmetals

TORONTO — November 15, 2024 – Trigon Metals Inc. (TSXV: TM) (OTCQB: PNTZF) is pleased to announce the company is participating in the upcoming 121 Mining Investment Conference in Dubai. Jed Richardson, CEO and Executive Chairman of Trigon Metals Inc. will be presenting about the Company’s recent and future planned activities.

121 Mining Investment Dubai will be hosting over 40 mining companies and more than 150 sophisticated investors for two days of pre-arranged, targeted 1-2-1 meetings.

Alongside the curated schedule of pre-booked meetings matching investors with appropriate projects, the conference programme will provide expert commentary and the latest market intelligence on key industry developments.

This year’s event is being held on November 19-20.

Any investors who would like to attend 121 Mining Investment Dubai can register for a free pass here.

About 121 Mining Investment

The 121 Mining Investment global event series connects portfolio managers and analysts from institutional funds, private equity groups and family offices with mining company management teams for 1-2-1, private in-person meetings.

121 Mining Investment has an ever-expanding global portfolio, currently covering London, New York, Cape Town, Dubai and Singapore, as well as online editions throughout the year.

About Trigon Metals Inc.

Trigon is a publicly-traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the Company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine.

For additional information, please contact:

Trigon Metals Inc.
Tom Panoulias
VP Corporate Development
+1 (647) 276-6002 x 1127
IR@trigonmetals.com
www.trigonmetals.com

Filed Under: 2024

PDF Download

Trigon Announces Resignation of Director and Stock Option Grant

14 November 2024 by trigonmetals

TORONTO — November 14, 2024 — Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) (“Trigon” or the “Company”) announces the resignation of Dr. David Shaw from the Company’s Board of Directors, effective immediately.

Dr. Shaw has faithfully served on the Board of Directors since 2019. The Company wishes to thank him for his contributions and dedicated service to Trigon over the past five years, and wish him much success in his future endeavors.

Jed Richardson, CEO and Executive Chairman of Trigon, commented, “We wish to thank David for his valuable insights and oversight as a director and wish him a very happy retirement.”

Stock Option Grant

The Company has granted a total of 125,000 stock options to an officer pursuant to its stock option plan. The options may be exercised at a price of $0.82 per option for a period of five years from the date of grant. The grant of options remains subject to the approval of the TSX Venture Exchange.

The Company has amended the share exchange agreement between the Company, PNT Financeco Corp. (formerly Base Metal Investment Services) and Commodity Makers International (“CMI”) dated November 29, 2023 (the “SEA”) to permit any unissued Trigon common shares issuable to CMI pursuant to the SEA to be issued immediately prior to any transaction which results in Change in Control (as defined in the SEA, as amended) of Trigon.

Trigon Metals Inc.

Trigon is a publicly-traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the Company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine.

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements regarding the stock option grants, the amendments to the SEA, changes to the Company’s board of directors, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Kombat Mine, and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information, contact Tom Panoulias, VP Corporate Development:
+1 (647) 276-6002 x 1127
tom.panoulias@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2024

Trigon Further Expands Mineralized Zones at Kombat Mine, Namibia – Intersects 5 Metres at 11.21% Cu and 117.89 g/t Ag

8 October 2024 by trigonmetals

Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) (“Trigon” or the “Company”) is pleased to announce the results of drilling from recent underground drilling at Shaft 1 at levels 3 and 5 at the Kombat mine. These holes were intended as confirmation but have significantly increased the grade and extended the known mineralization in the zone (see Figure 1 and 2). The holes targeted orebodies adjacent to historic workings and close to existing development thus allowing for near-term mining as Trigon ramps up and focuses solely on underground operations.

Highlights – Level 3 (105 metres from surface)

  • KWO-217: 5 metres at 11.21% Cu and 117.89 g/t Ag
  • KWO-218: 8 metres at 2.55% Cu and 18.65 g/t Ag
  • KWO-221: 9 metres at 3.93% Cu and 56.13 g/t Ag

Highlights – Level 5 (120 metres from surface)

  • KWO-194: 2 metres at 4.36% Cu and 22.27 g/t Ag
  • KWO-198: 4 metres at 2.83% Cu and 49.75 g/t Ag

Drillholes KWO-217, KWO-218 and KWO-221 were drilled on the South-Eastern margin of the sublevel 3.1, about 105m from surface where they all intercepted significant intercepts of mineralization between 8 metres and 16 metres to the North-East, South-West of their closest historical intercepts. Similarly, drillholes KWO-194 and KWO-198 were drilled on the Southern margin of the Level 5, about 150m from surface where multiple intercepts found between 80 metres and 84 metres to the East-West from their nearest historical intercepts (refer to Figure 3 and 4).

Jed Richardson, CEO and Executive Chairman of Trigon Metals, commented, “Even with 45 years of mining history at Kombat, the deposit continues to surprise us with new high-grade ore — even adjacent to old developments. There is tremendous value in this mine yet to be realized in our market capitalization.”

Dr. Andreas Rompel, Trigon’s VP Exploration, adds,“We are very excited about the grade we are intersecting in these holes as we forecast that the grade increases with depth, and these results are the confirmation of the prediction. Higher grade, together with the current high copper price make us very confident of a great future for the mine.”

Figure 1: Drill Core from KWO-217

Depiction of massive bornite with traces of chalcopyrite, occurring in a weak zone possible fault zone.

Figure 2: Drill Core from KWO-221

The drill core pictured in Figure 2 shows covellite, bornite and chalcopyrite occurring in highly calcified and fractured zone

Figure 3: Map of Drill Work Completed at Shaft One, Level Three of Kombat Mine

Figure 4: Map of Drilling Depicting High Grade Area on Hole KWO-198, Level Five of Kombat
Mine

Quality Assurance & Quality Control (QA/QC)

All sample assay results have been monitored through the Company’s quality assurance / quality control (QA / QC) program following E2941 − 21 Standard Practices for Extraction of Elements from Ores and Related Metallurgical Materials by 4 acid Digestion with ICPOES finish. Drill core was sent to an independent laboratory, African Laboratory Specialists Namibia (“ALS”), for analysis. ALS is an independent laboratory, located in Kombat, Namibia. Core samples were prepared using the ASTM procedures. Sample size: 3 kg, crushed split to 250g weighed sample (+/- 0.5000g).

Qualified Person

The scientific and technical information in this release has been reviewed and approved by Dr. Andreas Rompel, Pr.Sci.Nat. (400274/04), FSAIMM, the Company’s “qualified person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements regarding the exploration drilling at the Kombat Mine, the prospectivity and mineralization at the Kombat Mine, the Company’s exploration and drilling program, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Kombat Mine, and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts

For further information, contact Tom Panoulias, VP Corporate Development:
+1 (647) 276-6002 x 1127
tom.panoulias@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2024, News

PDF Download

Trigon Metals Announces Achievement of Key Mining Milestone – Underground Mining Operations Averaging 980 tpd of Ore Over 30-day Rolling Period at Kombat Mine, Namibia

19 September 2024 by trigonmetals

TORONTO — September 19, 2024 — Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF)  (“Trigon” or the “Company”) announces that it has reached a key milestone, having mined an average of 980 tonnes of ore a day from its underground operations over a 30 day period and that it will pause its open pit operations at the end of September 2024 at the Company’s Kombat mine in Namibia.

Trigon has achieved a key milestone as required pursuant to the terms of the streaming agreement with Sprott Private Resource Streaming and Royalty (B) Corp. and Sprott Mining Inc. by exceeding average production of 900 tonnes per day from its underground operations over 30 consecutive days (see press release dated October 24, 2022). This threshold was required to be met by October 31, 2025 and has been met by Trigon 13 months earlier than contractually required.

Following the success from its underground operations, Trigon has made the decision to pause its open pit mining activities with effect from the end of September 2024, based on the following supporting factors:

  1. The successful recommissioning of the underground mine with commercial production declared on May 23, 2024,
  2. Ability to mine 900 tonnes per day average over a 30 day period,
  3. The significant grade differential and positive contribution of the underground mining operations when compared to the open pit operations, and
  4. The current milling capacity constraint at the Kombat mine limits plant throughput to 1,000 tonnes per day, which in turn leads to the preferential feeding of higher-grade underground ore. The Company is able to fill any production shortfall through feeding of existing lower-grade stockpiles until such time as underground production reaches full steady state.

The mining contractor for the open-pit operations has been notified of the intended pause of open pit mining activities and will demobilise from the operations by the end of September 2024.

Jed Richardson, CEO and Executive Chairman of Trigon, commented, “This achievement not only reflects our ability to meet and surpass the feasibility study ramp-up targets but also de-risks the Sprott streaming agreement, ensuring that Trigon is not required to convert the principal advanced pursuant to the stream agreement into a loan. Exceeding the 900 tonnes per day average from the underground is a significant milestone for the Company and a testament to the team’s dedication to delivering on our commitments. We are grateful to Tulela Mining and Construction, our open pit mining contractor, for their exceptional support and partnership over the last four years.”

Rennie Morkel, President and COO of Trigon, commented, “We’ve faced significant challenges with the open pit, where stripping requirements have exceeded our forecasts. Pausing open pit operations will have an immediate positive impact on our operating costs, allowing us to focus on the higher-grade underground ore. This strategic shift enhances our ability to increase production while maintaining cost efficiency, ensuring a more sustainable and profitable operation moving forward.”

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101.

Change of Transfer Agent

Trigon also announces the appointment of Odyssey Trust Company (“Odyssey”) as the Company’s registrar and transfer agent. Odyssey will now be responsible for all transfers of Trigon’s shares through their office in Toronto rather than TSX Trust Company of Canada, which has resigned at the Company’s request. Shareholders need not take action in respect of the change in transfer agent and register.

Trigon Metals Inc.

Trigon is a publicly-traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine.

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements regarding the Sprott Financing agreement, operating costs, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Kombat mine, the operations at the Kombat mine, the economic viability of the Kombat mine, the Company’s expected production, the Company’s ability to comply with the terms of the stream agreement, the impact of pausing open-pit operations and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information, contact:
+1 (647) 276-6002 x 1127
tom.panoulias@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2024, News

PDF Download

Trigon Identifies New Zone in the Vicinity of Shaft #3 of Kombat Mine, Namibia

29 August 2024 by trigonmetals

TORONTO — August 29, 2024 — Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) (“Trigon” or the “Company”) is pleased to announce the results of drilling from the new zone identified in the vicinity of Shaft #3 of the Kombat mine. These areas are outside the proven and probable mine reserves published in March 2024. Mineralization in these areas was initially detected in surface drilling in 2023 and some historic drill work dating back to when Goldfields operated the mine. The holes classified as follow-up have yielded positive results and are outlined below (see Figures 1 and 2). Total volumes and tonnage for a mineral resource estimate have yet to be quantified. At present, drilling is spaced to define a mineral resource estimate in the indicated mineral resource category. Trigon continues its underground drilling operations, with approximately 3,500 meters planned by year-end.

Drilling Results Overview

  • E600-017 : 3.32% Cu over 7 meters
  • E600-018 : 2.08% Cu over 4 meters
  • E600-044 : 2.65% Cu over 3 meters
  • E600-045 : 2.48% Cu over 3 meters
  • E600-047 : 2.14% Cu over 5 meters
  • E600-055 : 2.61% Cu over 2 meters
  • E600-056 : 2.06% Cu over 2 meters
  • E600-065 : 2.21% Cu over 4 meters

Jed Richardson, CEO and Executive Chairman of Trigon, commented , “ Expanding our reserves and mine plan at Shaft #3 is crucial because it opens up more working faces in an area with untapped extraction capacity. Right now, all our ore is being extracted from the decline ramp adjacent to Shaft #1, which limits us to 1,000 tpd. With the second unused decline at Shaft #3, bringing in new ore from this area will enable us to ramp up extraction. This is especially important as we plan to increase plant throughput from 1,000 tpd to 2,000 tpd next year. ”

Dr. Andy Rompel, VP Exploration, adds, “Our drilling program to confirm resources, convert resources to reserves and identify new areas of higher grades continues underground. We believe there is potential for the deposit to expand in width further into the dolomites, not only along the dolomite phyllite contact. Soon, we will add exploration drilling to the resource drilling to develop a better understanding of the mineralization processes and consequently the predictability of the deposit.”

Next Steps by Trigon

1. Volume and Tonnes Calculation :

  • Trigon will estimate block volumes based on drilling intersections and apply the mineralization zone’s s bulk density to convert these volumes into tonnes.

2. Mineral Resource Estimate Category Upgrading :

  • Continue drilling within the indicated mineral resource estimate category.
  • Consider follow-up drilling at closer intervals in high-grade areas to potentially upgrade to the measured mineral resource estimate category.

3. Ongoing Drilling Plan :

  • Trigon plans to drill approximately 3,500 meters by year-end, providing additional data to refine mineral resource estimates and potentially increase confidence levels.

4. Grade Variability :

  • The variability in grades suggests heterogeneous mineralization. Understanding mineralization distribution and continuity is critical for more accurate mineral resource estimation and extraction planning.


Figure 1: Underground drilling at #3 shaft 


Figure 2: North-looking section showing the location of the diamond drilling (pink) 

Qualified Person

The scientific and technical information in this release has been reviewed and approved by Dr. Andreas Rompel, Pr.Sci.Nat. (400274/04), FSAIMM, the Company’s “qualified person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements regarding the exploration drilling at the Kombat Mine, mineral resource estimate calculation, the Company’s ability to produce a NI 43-101 compliant mineral resource estimate, the prospectivity and mineralization at the Kombat Mine, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Kombat Mine, and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information, contact Tom Panoulias, VP Corporate Development:
+1 (647) 276-6002 x 1127
tom.panoulias@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2024, News

PDF Download

Trigon Metals Reports First Quarter Operating and Financial Results 

21 August 2024 by trigonmetals


TORONTO — August 21, 2024 — Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) (“Trigon” or the “Company”) is pleased to announce its operating and financial results for the three months ended June 30, 2024. Shareholders and interested parties are invited to join a conference call hosted by Trigon management, tomorrow, Thursday, August 22, 2024, at 11:00 a.m. Eastern time to discuss the results. Dial-in details for the call can be found near the end of this press release. All amounts are expressed in U.S. dollars, unless otherwise stated. 

 Highlights 

  • The Kombat mine achieved first full quarter production with underground contribution in Q1 for fiscal year end in 2025, marking a major inflection point for the Company 
  • First quarter copper production was 2,302,726 pounds at C1 cash costs(1) of $3.23 per pound of copper produced. 
  • Silver production during the quarter was 33,399 ounces 
  • Positive Adjusted EBITDA (1) contribution of $1.8 million 
  • Net loss attributable to the shareholders of the Company of $2.1 million, or $0.05 per share on a basic and diluted basis compared to a net loss of $2.95 million, or $0.02 per share in the three months ended June 30, 2023 on a basic and diluted basis. 
  • Following excellent operating performance at the Kombat mine during the quarter, the Company is reaffirming all other 2025 fiscal year-end production, and C1 cash cost guidance ranges 


Jed Richardson, CEO and Executive Chairman of Trigon, commented, “Grade is king at Kombat, our first full quarter of contribution from our high grade underground is demonstrating the profitability at the mine. Achieving solid copper and silver production driven by favourable grade reconciliations have continued into the second quarter. This trend has allowed us to maintain our full-year copper and silver production guidance, which we expect will translate to achieving the lower end of our fiscal year 2025 cash cost guidance.” 

Mining & Milling Operations 

At the Kombat mine, the first quarter was marked by several record-breaking underground mining days. Underground ore tonnes mined for the quarter totalled 57,070 tonnes at an average grade of 2.05%, and open pit production of 29,715 tonnes at an average grade of 1.23%. A total of 70,483 tonnes were milled during the quarter at a 1.67% average grade resulting in the production of 1,045 tonnes of copper. 

The Company announced Commercial Production from the underground mine on April 30, 2024, and is pleased to report that the underground mine has continued to perform and exceed the mining targets defined in its feasibility study (the “Feasibility Study”). The Feasibility Study was prepared by SRK Consulting South Africa (Pty) Ltd (“SRK”) in accordance with Canadian Securities Administrators’ National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). 


Image 1: Kombat Open Pit 

Image 2: Kombat Underground 

Image 3: Inside the Mill at Kombat Mine 


Table 1: Operating and Financial Highlights (Reported in USD) 

MINING 



OP Ore Mined (tonnes) 
Three Months Ended June 30, 2024

29,715 
Three Months Ended March 31, 2024

85,365 
OP Copper Grade % 1.23% 0.98% 
OP Silver Grade (g/t) 9.98 6.88 
UG Ore Mined (tonnes) 57,070 12,160 
UG Copper Grade 2.05% 2.36% 
UG Silver Grade (g/t) 11.44 6.48 
Total Ore Mined (tonnes) 86,785 97,525 
MILLING 
Ore Processed (tonnes) 70,483 69,354 
Copper recovery (%) 88.3% 80.5% 
Copper Concentrate Production (tonnes) 3,876 2,385 
Concentrate Grade (Cu %) 27.1% 23.9% 
Concentrate Grade (Ag g/t) 271 23.9% 
Copper Product Produced (tonnes) 1,045 570 
Copper Product Produced (lbs) 2,302,726 1,255,752 
Silver Product Produced (oz) 33,399 14,653 
SALES 
Copper Concentrate Sold (dry metric tonnes) 4,596 2,095 
Copper Concentrate Sold (lbs) 10,132,434 4,618,679 
Copper Product Sold (tonnes) 968 424 
Copper Product Sold (lbs) 2,134,072 934,759 
Realized copper price (per lb) $ 4.18 $4.12 
C1 cash cost/lb (100% payability) (1) $ 3.23 3.35 
FINANCIAL HIGHLIGHTS  ($ in 000’s, except per share amounts) 
Revenues $10,032 $3,853 
Gross Profit $1,941 $ (153) 
EBITDA $654 $16,260 
Adjusted EBITDA $1,800 $168 
Cash flow from operations $70 $(740) 
Net (loss) income $(2,215) $13,440 



Net (loss) income attributable to shareholders of the Company 

Three Months Ended June 30, 2024

$(2,108) 

Three Months Ended March 31, 2024

$13,908 
Per share (basic) $(0.05) $(0.07) 
Per share (diluted) $(0.05) $(0.07) 
Cash, cash equivalents and short-term investments $1,173 $1,417 

OP = Open Pit 
UG = Underground 
(1)EBITDA, net income (loss) attributable to owners of the Company, income (loss) per share attributable to owners of the Company, net (cash), working capital, C1 cash cost, copper production are non-IFRS measures. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. Please refer to the Company’s discussion of Non-IFRS measures in its Management Discussion and Analysis for the three months ended June 30, 2024. 

Investor Resources

The full financial report is available on the Investors page under “Financial Reports.”

View it

Exploration Update 

Trigon is allocating $2.5 million to $3.5 million to exploration programs for mineral reserve and resource replacement and on other exploration prospects in and around Kombat’s existing infrastructure and landholdings in the Kombat valley. 

On April 18, 2024, the Company released the highlights of its exploration campaign at Schlangental, a key prospect within the wider Kombat property, situated approximately 15km east of the active mining licence ML73B. This announcement followed the Company finalizing its comprehensive exploration plan for the expansive Kombat property, spanning nearly 35 km from Gross Otavi in the west and Schlangental to the east. 

Drilling at Schlangental represents the first campaign testing mineralization outside of the main Kombat mining license on the Copper King Extension exploration prospect. Surface mineralization attracted Trigon geologists to the Schlangental area where reports of historic drilling indicated that mineralization continued at depth, but no drill core or detailed logs were available. Of the planned 36 holes totalling 4000m, only two holes have been drilled to date, with both holes intercepting mineralization at modest depths. 

Subsequent Events 

To support the commencement of production and associated working capital needs at the Kombat mine, the Company entered into an agreement with IXM whereby IXM agreed to advance USD$2.5 million in two tranches of USD$1.25 million each, with tranche one immediately drawn down and the second tranche being available for drawdown between August 19, 2024 and August 30, 2024. The advance will be repaid in principal portions of USD$208,334 per month commencing in October 2024 through September 2025 repayable in deliveries of copper concentrate. Interest will be charged at the 30-day secured overnight financing rate average plus 2.5% and paid in cash. 

2025 Production and Cost Guidance 

Following record operating performance at the Kombat mine during the quarter, the Company is reaffirming its 2025 copper production guidance of 12,125,000 to 13,448,000 pounds of copper. The Company expects mined and processed copper grades to remain in line with guidance for 2025. 

The Company’s updated cost guidance for 2024 assumes a foreign exchange rate of 18.40 NAD per USD and a silver price of $25 per ounce. 

Table 2: Financial Year 2025  

Description 

Unit 
FY 2025 Guidance
Floor 
FY 2025 Guidance
Ceiling 
Underground Mining Tonnes 250,000 280,000 
Ore Grade % 1.95% 2.30% 
Processing Tonnes 260,000 312,000 
Copper Produced Tonnes 5,500 6,100 
Copper Produced lbs 12,125,000 13,448,000 
Cash Cost $/lbs 3.15 2.80 

Conference Call Details 

The Company will hold a conference call to discuss these results on Thursday, August 22, 2024 at 11:00 a.m. EST (8:00 a.m. PST). Please pre-register at the link provided below. 

Date: Thursday, August 22, 2024 
Time: 11:00 a.m. EST/8:00 a.m. PST 
Dial in: Canada/USA: 1-800-990-4333 
Toronto: 1-289 514-5000 
New York: 1-646-769-9600 
please dial in 5-10 minutes prior and ask to join the call 

Pre-Register: 

Registration link: https://emportal.ink/3ApVh5v 
Replay: Canada/USA toll-free: 1-888-660-6264 
Replay Passcode: 75661# 

Qualified Person 

The technical information presented in this press release has been reviewed and approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101. 

Trigon Metals Inc. 

Trigon is a publicly-traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine. 

Cautionary Notes 

This news release may contain forward-looking statements. These statements include statements regarding the Company’s mining operations, the timing and results of mining activities, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Kombat mine, the economic viability of the Kombat mine, the Company’s ability to expand or replace mineral resources and reserves, the projected costs and production at the Kombat mine, the agreement with IXM and the Company’s ability to repay IXM, the prices of copper and silver and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws. 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

For further information, contact Investor Relations: 
+1 647 276 6002 
IR@trigonmetals.com 
Website: www.trigonmetals.com 

Filed Under: 2024, News

PDF Download

Trigon Metals Reports Q4 2024 Financial Results, Operating Costs Fall to $3.35/lb Copper Produced at Kombat Mine, Namibia

30 July 2024 by trigonmetals

TORONTO — July 30, 2024 — Trigon Metals Inc. (TSX-V: TM; OTCQB: PNTZF) (“Trigon” or the “Company”) Trigon is pleased to report as of July 29, 2024, the Company has filed its financial statements for the year ended March 31, 2024 and details below the operational milestones for the quarter ending March 31, 2024.

Trigon reports a profit from continuing operations of USD $13,439,695 for the three months ended March 31, 2024 and a net loss of $1,474,523 for the twelve months ending March 31, 2024. Results were heavily skewed by the positive revaluation of the liability associated with the Sprott Streaming agreement, to align with the Company’s NI 43-101 SRK Feasibility Study (the Feasibility Study can be found under the Company’s profile at www.sedarplus.ca and on the Company’s website). However, improvements at the operational level where the beginnings of the impact of underground production had a dramatic impact on operating costs. The company reported C1 cash costs of $3.35/lb on 1,255,652 lbs of copper production in the quarter, a marked improvement over $3.96/lb reported in Q3 2024 (see filing dated February 27, 2024). The operating results were positively impacted by weakness in the Namibian dollar compared to the US dollar, the Company’s reporting currency, and higher ore tonnage with the contribution of the pre-commercial underground ore tonnes.

In the quarter, 85,365 tonnes of ore was mined from the open pit at 0.98% copper grade and 12,160 tonnes from the underground at 2.36% copper, totalling 97,525 of ore grading 1.15 %, besting the 90,000 tonnes of ore planned to be mined.

Commenting, Jed Richardson, CEO & Executive Chairman, “Fiscal 2024 was a momentous year for the Company, starting open pit mining, commissioning the mill and starting the underground mining operations at the tail end of the year. In a few short weeks, we will be reporting Q1 2025, completed June 30, 2024, we anticipate continuing our progress in demonstrating the profitability of the Kombat Mine and building Trigon Metals into a mid-tier copper mining company.”

Qualified Person
The scientific and technical information in this release has been reviewed and approved by Dr. Andreas Rompel, Pr.Sci.Nat. (400274/04), FSAIMM, the Company’s “qualified person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Trigon Metals Inc.
Trigon is a publicly-traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine.

Non-IFRS Measures
C1 cost measure includes the cost of mining, milling, Namibian site level general and administrative expenses, and royalties but excludes capital costs, exploration costs, and corporate overheads. This measure primarily focuses on the direct costs of producing our copper concentrate product on a 100% payability basis. The C1 cost metric does not include costs like capital costs, exploration costs, corporate overheads, or any other costs not directly related to production. Management thus believes C1 is a measure that best reflects the efficiency and effectiveness of our Namibian mining operations. Please refer to our MD&A for the year-ended March 31, 2024 for a reconciliation of C1 costs.

Cautionary Notes
This news release may contain forward-looking statements. These statements include statements regarding the Company’s mining operations, the Company’s financial results, the timing of mining activities, the economic viability of the Kombat Mine, financial currency exchange, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Kombat Project, and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts

For further information, contact Investor Relations:
+1 647 276 6002
IR@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2024, News

  • « Go to Previous Page
  • Go to page 1
  • Go to page 2
  • Go to page 3
  • Go to page 4
  • Go to page 5
  • Go to page 6
  • Interim pages omitted …
  • Go to page 24
  • Go to Next Page »

Footer

  • Home
  • Corporate
  • Assets
    • Addana Project
    • Silver Hill Project
    • Kalahari Copper Project
  • Investors
    • Overview
    • Stock Information
    • Corporate Presentation
    • Financial Documents
  • News & Press Releases
  • Contact
    • facebook
    • twitter
    • instagram
    • linkedin
    • youtube

Copyright © 2026 Trigon Metals. All Rights Reserved.