• Skip to primary navigation
  • Skip to main content
  • Skip to footer

TSX-V: TM | FRA: TZU2 | OTCQB: PNTZF

Trigon Metals

Trigon Metals

Building A Mid-Tier African Copper Producer

  • Home
  • Corporate
  • Assets
    • Addana Project
    • Silver Hill Project
    • Kalahari Copper Project
  • Investors
    • Overview
    • Stock Information
    • Corporate Presentation
    • Reports & Filings
    • IR Contact
  • News & Press Releases
  • Contact
    • facebook
    • twitter
    • instagram
    • linkedin
    • youtube

trigonmetals

PDF Download

New Drilling at Kombat Mine – East 400 Pit Delineates 9 Metres at 7.9% Cu and 23.8 g/t Ag

6 July 2023 by trigonmetals

TORONTO — July 6, 2023 –Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) Trigon Metals Inc. (TSX-V: TM; OTCQB: PNTZF) (“Trigon” or the “Company”) announces results from confirmation drilling at the Kombat Mine in Namibia (the “Project”) with key highlights from the drilling campaign. The reported results are from the East 400 area, and the Kavango North Pit. The East 400 area is located 250m east of the Kavango Pit where mining began in May 2023. Kavango North pit is an extension of the Kavango Pit.

Highlights of the Drill Results

The team has drilled some confirmation holes in the East 400 area. East 400 is the smallest and shallowest of the planned pits at the Kombat mine. The holes did exhibit evidence of oxidization in the mineralized zone, but also returned some of the highest silver grades reported in drilling this year.

E400INF009 (3.7 azimuth, -53 dip)
Intersected 11m, 1.75% Copper, 20.61g/t Silver, from 31m.

E400INF013 (186.4 azimuth, -58.7 dip)
Intersected 9m, 7.89% Copper, 23.80g/t Silver, from 30m.

At the Kavango North pit, where mining is currently active, the team drilled confirmatory holes within the planned resource envelope. The results of the drilling displayed a strong correlation to the resource model, supported the targeted head grade of 1.2% copper and exhibited higher silver grades in excess of the resource average 6.2 g/t.

KVNINF005 (180 azimuth, -63 dip)
Intersected 15m, 1.59% copper, 13.07g/t silver, from 17m.

KVNINF014 (171.8 azimuth, -62.1 dip)
Intersected 5m, 2.78% copper, 36.99 g/t silver, from 35m.

KVNINF017 (181.1 azimuth, -64.6 dip)
Intersected 29m, 1.19% copper, 10.84 g/t silver, from 20m.

These infill holes drilled at East 400 and Kavango North pit serve as confirmation of mineralization previously modeled, however, copper and silver grades are higher than expected.

Jed Richardson, Trigon’s President and CEO, commented, “Drilling is now focused on East 400 and East 600, completing resource confirmation and definition. One of the three drill rigs active at Kombat will be moved to Gross Otavi on the western limb of the Copper King Extension later this month.”

“Our mining ramp-up continues at Kombat. We have already moved 210,000 tonnes of ore and waste this month, exceeding the 124,000 tonnes moved in May, and our June target of 180,000 tonnes. At full production, monthly mined ore and waste will average 240,000 tonnes per month and our team has already shown this is a target they will be able to meet and exceed in the coming months. Mill start-up is planned for the end of July, with first concentrate shipment in August.”

Figure 1: Map of the East 400 Planned Pit Area Showing Hole Locations — Drill holes are spaced at 5m intervals, testing gaps in the resource model and measuring contact between sulfide and oxide mineralization

Figure 2: Drill Core – Hole E400INF-009 34-41m — Abundant visible copper sulfide mineralization (chalcopyrite). In weathered parts of the core, the copper is predominantly in the form of chalcocite, a copper sulfide, which the mill has proven to be effective in recovering.

Figure 3: Drill Core – Hole E400INF-013 27-34m — This very high-grade hole, including one metre of 21.87% Cu and 90.99 g/t Ag, has weathering similar to the core pictured in Figure 2. The copper is predominantly in the sulfide mineral chalcocite. 

The assays have been prepared and classified by Trigon Mining (Namibia)(Pty) Ltd in accordance with the reporting guidelines as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) as required by the Canadian Securities Administrators.

Quality Assurance & Quality Control (QA/QC):

All sample assay results have been monitored through the Company’s quality assurance / quality control (QA / QC) program following E2941 − 21 Standard Practices for Extraction of Elements from Ores and Related Metallurgical Materials by 4 acid Digestion with ICPOES finish. Drill core was sent to an independent laboratory, African Laboratory Specialists Namibia (“ALS”), for analysis. ALS is an independent laboratory, located in Kombat, Namibia. Core samples were prepared using the ASTM procedures. Sample size: 3 kg, crushed split to 250g weighed sample (+/- 0.5000g).

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101.

Trigon Metals Inc.

Trigon is a publicly traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine. In Morocco, the Company is the holder of the Silver Hill project, a highly prospective copper and silver exploration project.

Cautionary Notes

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements. These statements include statements regarding the Project, the mineralization of the Project, the Company’s exploration plans and results thereof, the prospectivity of the Project, the economic viability of the Project, the Company’s ability to restart operations and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

Contacts

For further information, contact:
Jed Richardson
+1 647 276 6002
jed.richardson@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2023, News

Trigon Metals Announces $3 Million Brokered Private Placement

29 June 2023 by trigonmetals

/NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES /

TORONTO, June 28, 2023 – Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF)(“Trigon” or the “Company”) is pleased to announce that it has entered into an agreement with Beacon Securities Limited (the “Lead Agent”) to act as lead agent and sole bookrunner on behalf of a syndicate of agents, including Echelon Wealth Partners Inc. (together with the Lead Agent, the “Agents”), in connection with a commercially reasonable “best efforts” private placement of units of the Company (the “Units”) at a price of $0.20 per Unit (the “Issue Price”) for gross proceeds to the Company of approximately $3,000,000, subject to the maximum amount that may be issued under Part 5A (the “Listed Issuer Financing Exemption”) of National Instrument 45-106 – Prospectus Exemptions (“NI 45-106”) (the “Offering”).

Each Unit will be comprised of one common share of the Company (each, a “Common Share”) and one-half of one Common Share purchase warrant (each whole warrant, a “Warrant”). Each Warrant will entitle the holder thereof to acquire one Common Share (a “Warrant Share”) at an exercise price of $0.30 per Warrant Share at any time for a period of 36 months following the closing of the Offering.

The Company intends to use the net proceeds of the Offering for mineral exploration activities on the Company’s Kombat Project, Silver Hill Project and Addana Project and general working capital requirements.

Subject to compliance with applicable regulatory requirements and in accordance with NI 45-106, the Units will be offered for sale to purchasers resident in Canada, except Quebec, and other qualifying jurisdictions, pursuant to the Listed Issuer Financing Exemption. The securities issued under the Listed Issuer Financing Exemption will not be subject to a hold period pursuant to applicable Canadian securities laws.

There is an offering document related to the Offering that can be accessed under the Company’s profile at www.sedar.com and on the Company’s website at www.trigonmetals.com. Prospective investors should read this offering document before making an investment decision.

The Offering is expected to close on or about July 12, 2023, or such date as the Lead Agent and the Company may agree upon, and is subject to certain conditions, including but not limited to, the receipt of all necessary approvals including the conditional approval of the TSX Venture Exchange (the “TSXV“). Completion of the Offering remains subject to the receipt of all necessary regulatory approvals, including the approval of the TSXV.

As consideration for their services, the Agents will receive a cash commission of 6.0% of the gross proceeds of the Offering (provided that a cash fee equal to 3.0% shall be payable in respect of gross proceeds from Units sold to purchasers included on a president’s list to be determined by the Company (the “President’s List“) and compensation options (the “Compensation Options”) in an amount equal to 6.0% of the number of Units sold pursuant to the Offering (provided that Compensation Options equal to 3.0% shall be issuable in respect of Units sold to purchasers on the President’s List). Each Compensation Option will be exercisable to purchase one common share of the Company at the Issue Price for a period of 36 months from the closing date of the Offering.

This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful. The securities offered have not been registered under the U.S. Securities Act of 1933, as amended (the “U.S. Securities Act”), and may not be offered or sold to, or for the account or benefit of, persons in the “United States” or “U.S. persons” (as such terms are defined in Regulation S under the U.S. Securities Act) absent registration under the U.S. Securities Act and all applicable state securities laws or compliance with an applicable exemption from such registration requirements.

Trigon Metals Inc.

Trigon is a publicly traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat mine. In Morocco, the Company is the holder of the Silver Hill project, a highly prospective copper and silver exploration project.

Cautionary Notes

This press release includes certain statements that may be deemed “forward-looking statements”. All statements in this release (other than statements of historical facts) that address future business development, project developments and/or acquisition activities (including any related required financings), timelines, events, or developments that the Company is pursuing are forward-looking statements, including without limitation statements with respect to: the timing and completion of the Offering; the ability of the Company to raise the targeted or maximum proceeds of the Offering; the intended use of proceeds from the Offering; the exercise of the Warrants; the receipt of any regulatory approvals, including the final approval of the TSXV; and future capital requirements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance or results, and actual results or developments may differ materially from those in forward-looking statements.

Regarding the disclosure in the press release above, the Company has assumed, among other things, that it will receive the approval of the TSXV in regard to the Offering and the issuance of the Units in connection therewith. If the TSXV objects or does not provide its approval for the transactions contemplated hereby, then the Company will have to negotiate revised terms with the applicable counterparties, and there is no assurance that the parties will reach an agreement that is acceptable to the Company. Factors that could cause actual results to differ materially from those in forward-looking statements include, without limitation: the availability and procurement of any required interim and/or long-term financing that may be required; general economic, market or business conditions; and other factors discussed in the management discussion and analysis section of the Company’s interim and most recent annual financial statements or other reports and filings with the TSXV and applicable Canadian securities regulations.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Filed Under: 2023, News

PDF Download

Trigon Granted Permits to Highly Prospective High-Grade Silver Lead Ground in Morocco – Addana Project, Morocco

28 June 2023 by trigonmetals

TORONTO — June 28, 2023 –Trigon Metals Inc. (TSX-V: TM, OTCQB: PNTZF) (“Trigon” or the “Company”) is pleased to announce that it has been granted seven exclusive prospecting licences encompassing 112 square kilometres in the Addana Mountains of Southern Morocco, (collectively called the “Addana Project”).

The Addana Project is a silver and lead, polymetallic deposit located in a district that has seen lead and silver mining for hundreds of years. Numerous high-grade veins can be seen from surface over an area over 40 km in strike length. The veins vary in length from 15m to 2.5km, generally about 40cm thick, often only a few metres and possibly amenable to the use of bulk open pit mining methods.

Historical mining was done using hand tools to a depth of up to 10 metres. Historical tax data from the area shows that taxes were paid on 600 tonnes per year of raw ore extracted from the area, divided into 3 categories of material:

  • Al Quifox ore (80% lead and 1200g/t silver), Amjoute ore (65% lead and 750-900g/t silver) basic ore 50% lead and 600g/t silver.

Grab samples collected by Trigon from historic waste material

  • T1 – 317 g/t silver and 22.6% lead
  • T2 – 99 g/t silver and 9.5% lead
  • T3 – 564 g/t silver, 24.8% lead and 5.3% zinc

Jed Richardson, President & CEO of Trigon Metals, commented, “The Addana Project represents another example of the potential for world-class projects in Morocco. All seven permits have extensive artisanal workings showing the presence of silver lead veins. Analysis of slags from the area shows potential for material concentrations of copper, zinc and cobalt associated with silver and lead. Notably, the Addana permit area is 14 times the size of our target area at Silver Hill and the historic workings are far more pervasive.”

The Addana Project is located near Akka, in the province of Tata. It is located about 300 km from Agadir on the road connecting Agadir to Tata. The Addana Range was formed by an anticlinal fold in the Bani series of quartzites and schists, of Ordovician age.

Trigon has not verified the historical results contained in this press release and is not relying on them as current mineral resources or mineral reserves. Note that the grab samples are select samples and are not necessarily representative of mineralization on the Addana Project. Readers are cautioned that there has been insufficient exploration by the Company or its qualified person at the Addana Project to define a mineral resource or mineral reserve; and it is uncertain whether further exploration will result in these targets being delineated as a mineral resource or mineral reserve.

Strategic Alternatives for Moroccan Assets

Trigon secured the permits for the Addana Project as part of a reallocation of exploration permits in the Tata region. With the grant of the associated permits, Trigon has three years to explore before the permits must be renewed. Trigon must mobilize and establish exploration on the property within six months of their granting.

As the Company develops the Addana and Silver Hill projects learning more about the size potential of each, the Board of Directors will explore various strategies to maximize shareholder value, including a spin-out of the Morocco assets as a dividend to Trigon shareholders.

Figure 1: Seven Addana Permits, Southern Morocco; Each block represents a 4×4 km claim. The artisanal workings follow a 40 km trend.

Figure 2: Areas of Artisanal Working on PR 3941260; Four identified target areas on the first permit area. The strike length from targets 1 to 4 is approximately 3km.

Figure 3: Target Area 1; Four visible veins with workings

Figure 4: Target Area 2; Eighteen visible veins with historical workings

Figure 5: Target Area 3 North; Twenty-five visible veins with historical workings

Figure 6: Target Area 3 South; Twenty-five visible veins with historical workings

Figure 7: Target 4; Five visible veins with historical workings

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure by Jed Diner (M.Sc., P.Geol.) is a Qualified Person (QP) as defined by National Instrument 43-101. Mr. Diner is independent of the Company.

Trigon Metals Inc.

Trigon is a publicly traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat mine. In Morocco, the Company is the holder of the Silver Hill project, a highly prospective copper and silver exploration project.

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements regarding the Addana Project and the acquisition thereof, the prospectivity of the Addana Project, the planned exploration program for the Addana Project, the Company’s strategies and the Company’s abilities to execute such strategies, the Company’s expectations for the Addana Project, and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts

For further information, contact:

Jed Richardson
+1 647 276 6002
jed.richardson@trigonmetals.com

Website: www.trigonmetals.com

Filed Under: 2023, News

PDF Download

Trigon Closes Acquisition of Copper King Extension at Kombat in Namibia

13 June 2023 by trigonmetals

TORONTO — Jun 13, 2023 — Trigon Metals Inc. (TSX-V: TM; OTCQB: PNTZF)T (“Trigon”
or the “Company”) is pleased to announce that it has closed the acquisition of exclusive
prospecting licence 8529 (“EPL 8529” or the “Licence”) referred to as the Copper King
Extension, as announced on January 30, 2023, which significantly expands its land
holding in Namibia. The Licence surrounds Trigon’s Kombat and Gross Otavi projects in
the Otavi Mountainland, a region associated with high grade copper and silver
mineralization.


EPL 8529 is situated on the Kombat trend, the mineralized structure on which the Kombat
project is located and covers an area of 5,614 hectares in the Grootfontein District of the
Otjozondjupa Region, between the towns of Otavi to the west and Grootfontein to the
east.

From a geological perspective, the Licence represents a potential strike extension of the
Kombat project, with various known mineral occurrences on the property. Trigon
management has extensive knowledge of the area and plans to implement an exploration
program in conjunction with its ongoing exploration work on the Kombat project areas.
On June 5, 2023, Trigon received confirmation from the Ministry of Mines and Energy in
Namibia, that the Minister had approved the transfer of the Licence from the seller, Otjiwa
Mining and Prospecting CC, to Trigon with effect from May 24, 2023. This was the final
outstanding condition for the closing of the acquisition.

The purchase consideration for the Licence comprises a cash price of N$1,750,000
(approximately C$122,556) and the issuance of 84,129 Trigon common shares to the
vendor. The Trigon shares are subject to a four-month statutory hold period.
The transaction is an arm’s length transaction for the purposes of the policies of the TSX
Venture Exchange (the “TSXV”) and the transaction qualifies as an “Expedited
Acquisition” under TSXV Policy 5.3.

EPL 8529 is valid for a period of three years from November 9, 2022 to November 8,
2025.

Jed Richardson, President & CEO of Trigon Metals, commented, “Drill exploration of
targets on the Copper King Extension will start in the coming weeks. The large number
of copper showings fuel our expectations for new discoveries along the 35km of
strikelength.”

Qualified Person
The technical information presented in this press release has been reviewed and
approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a
Qualified Person as defined by NI 43-101.

Trigon Metals Inc.
Trigon is a publicly traded Canadian exploration and development company with its core
business focused on copper and silver holdings in mine-friendly African jurisdictions.
Currently the company has operations in Namibia and Morocco. In Namibia, the Company
holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of
Namibia widely recognized for its high-grade copper deposits, where the Company is
focused on exploration and re-development of the previously producing Kombat mine. In
Morocco, the Company is the holder of the Silver Hill project, a highly prospective copper
and silver exploration project.

Cautionary Notes
This news release may contain forward-looking statements. These statements include
statements regarding EPL 8529 and the acquisition thereof, the prospectivity of EPL
8529, the planned exploration program for Kombat and EPL 8529, the Company’s
strategies and the Company’s abilities to execute such strategies, the Company’s
expectations for Kombat and EPL 8529, and the Company’s future plans and objectives.
These statements are based on current expectations and assumptions that are subject
to risks and uncertainties. Actual results could differ materially because of factors
discussed in the management discussion and analysis section of our interim and most
recent annual financial statements or other reports and filings with the TSX Venture
Exchange and applicable Canadian securities regulations. We do not assume any
obligation to update any forward-looking statements, except as required by applicable
laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term
is defined in the policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.


For further information, contact:
Jed Richardson
+1 647 276 6002
jed.richardson@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2023, News

PDF Download

Trigon Confirms 76m at 1.48%Cu and 8.9g/t Ag –22 metres from the planned East 600 pit at its Kombat Mine, Namibia

8 June 2023 by trigonmetals

CORRECTION NOTICE: Reissued with corrections to column headings in attached tables

TORONTO — Jun 8, 2023 — Trigon Metals Inc. (TSX-V: TM; OTCQB: PNTZF) (“Trigon” or the “Company”) announces drill results from the East 600 planned open pit, at the Kombat mine in Namibia (the “Project”). These holes were drilled to confirm known historical mineral resources drilled previously by the prior owner from the underground. These results are new to the East 600 area and represent some of the longest mineralized intercepts drilled from surface. East 600, also referred to as the ore capping zone, is located 400m east of the main pit and has been incorporated into our resource plan and mine plan.

Highlights of the Drill Results

Hole 2
Intersected 4.34m, 1.56% Cu, from 37m

Hole 3
Intersected 10m, 1.14% Cu, from 40m

Hole 4
Intersected 76m at 1.48%Cu, 8.9g/t Ag from 22m, including:

– 13m, 1.46% Cu, 5.7g/t Ag, from 3m, and
– 21m, 3.54%Cu, 17.9g/t Ag from 49m, and
– 11m, 1.39%Cu, 5.61g/t Ag from 87m.

Mining Update

Trigon has now completed one full month of mining at Kombat, and the ramp-up to full mining production is going well. The goal for May was 120,000t of mined rock, and 124,000t were mined. May was strictly waste tonnes, but high-grade mineralization has been exposed in several areas of the pit. The first ore tonnes are scheduled to be mined towards the end of June.

Blasts have occurred on schedule once a week, this schedule will be maintained until the mill starts at the end of July, whereupon blasts are scheduled twice a week. We anticipate mining rates will average 8,000 tpd when the mine is in full operation. However, in start-up mode mining rates have reached up to 10,000t on days when the team has pushed to test capacity.

Jed Richardson, Trigon’s President and CEO, commented, “Current drilling at East 600 is increasing our confidence of adding more high-grade ore and reducing our overall strip ratio. We will continue to test areas around the planned open pits; East 400, East 600, and East 900 as potential sources for adding near surface high-grade ore. In addition, drilling is planned for the Otavi area, 12km west of the Kombat mining permit to test the limbs of our 35km of mineralized strike-length corridor.”

The assays have been prepared and classified by Trigon Mining (Namibia)(Pty) Ltd in accordance with the reporting guidelines as set out in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) as required by the Canadian Securities Administrators.

Figure 1: Map of the Kavango Program Area Showing the Location of Holes 2, 3 and 4 in the Kavango East Area The holes 2, 3 and 4 are located the heart of the Kavango Trend in the East 600 (Ore Cap) Pit.

Figure 2: Cross Section – Hole 2 Figure 2 shows the modelling done before the drilling of OC0002(Dip-60). It shows a copper intersection between 25-41.34m with 1.10% Cu between 35-41.34m.

Figure 3: Drill Core — Hole 2 The core pictured shows visible sulfide mineralization.

Figure 4: Cross Section – Hole 3 Figure 4 shows the modelling done before the drilling of OC0003(Dip-69.9). It shows a copper intersection between 3-65.15m with 1.14% Cu over 10m between 40-50m.

Figure 5: Drill Core from Hole 3 The core pictured in Figure 5 shows the clearly visible sulfide mineralization.

Figure 6: Cross section — Hole 4 Figure 6 shows the modelling done before the drilling of OC0004(Dip-44.3). This shows a copper intersection between 4-107, with traces of copper oxide between 4-7m, with copper sulfide mainly between 22-107m. There are three ore pockets, 1.26% Cu over 15m between 22-37m, 3.13%Cu over 24m between 47-71m and 1.29% Cu over 12m between 86-98m.

Figure 7: Drill Core from Hole 4 The core pictured in Figure 7, again shows shiny golden-coloured chalcopyrite mineralization (copper mineral) throughout the drill core. 

Table of Drilling Highlights

HoleFrom (m)  To (m)Length (m)Cu%Pb%Zn%Ag (ppm)
OC000237.0038.001.002.810.360.012.50
OC000238.0039.001.002.750.440.012.50
OC000239.0040.001.002.762.90.019.32
OC000240.0041.341.342.712.30.016.73
OC000340.0041.001.002.813.210.019.37
OC000341.0042.001.002.800.240.012.50
OC000342.0043.001.002.770.150.012.50
OC000343.0044.001.002.843.070.012.50
OC000344.0045.001.002.831.450.012.50
OC000345.0046.001.002.810.730.012.50
OC000346.0047.001.002.800.340.012.50
OC000347.0048.001.002.800.160.012.50
OC000348.0049.001.002.840.420.012.50
OC000349.0050.001.002.841.580.0112.62
OC000422.0023.001.002.850.810.922.50
OC000423.0024.001.002.790.250.0052.50
OC000424.0025.001.002.872.970.0112.47
OC000425.0026.001.002.822.260.0052.50
OC000426.0028.002.002.802.470.0052.50
OC000428.0029.001.002.852.90.0218.05
OC000429.0030.001.002.770.570.0055.68
OC000430.0031.001.002.780.20.0052.50
OC000431.0032.001.002.780.650.0052.50
OC000432.0033.001.002.792.20.00515.67
OC000433.0034.001.002.750.640.0052.50
OC000434.0035.001.002.740.640.0052.50
OC000435.0037.002.002.810.530.0052.50
OC000437.0039.002.002.770.030.0052.50
OC000439.0041.002.002.760.030.0052.50
OC000441.0042.001.002.810.0050.0052.50
OC000442.0043.001.002.790.060.0052.50
OC000443.0044.001.002.760.280.0052.50
OC000444.0047.003.002.780.0050.0052.50
OC000447.0049.002.002.770.170.0052.50
OC000449.0051.002.002.700.650.0052.50
OC000451.0052.001.002.742.650.0057.44
OC000452.0053.001.002.582.080.0056.40
OC000453.0054.001.002.868.330.0231.23
OC000454.0055.001.002.815.440.00519.03
OC000455.0057.002.002.701.080.0052.50
OC000457.0059.002.002.770.670.0052.50
OC000459.0061.002.002.690.30.0052.50
OC000461.0062.001.002.930.60.0052.50
OC000462.0063.001.002.6712.010.00574.67
OC000463.0065.002.002.946.750.00541.50
OC000465.0066.001.002.681.110.0056.17
OC000466.0068.002.002.886.780.0146.80
OC000468.0069.001.002.948.410.0129.72
OC000469.0070.001.002.721.340.012.50
OC000470.0071.001.002.690.390.092.50
OC000471.0072.001.002.810.041.562.50
OC000472.0073.001.002.750.020.112.50
OC000473.0075.002.002.740.0050.0052.50
OC000475.0077.002.002.800.0050.082.50
OC000477.0078.001.003.400.150.274.48
OC000478.0079.001.002.970.110.0723.00
OC000479.0080.001.002.800.270.082.50
OC000480.0081.001.002.740.070.722.50
OC000481.0082.001.002.790.180.382.50
OC000482.0083.001.002.750.150.392.50
OC000483.0084.001.002.760.020.232.50
OC000484.0085.001.002.730.040.52.50
OC000485.0086.001.002.780.050.052.50
OC000486.0087.001.002.860.120.0052.50
OC000487.0088.001.002.851.480.022.50
OC000488.0089.001.002.801.630.0052.50
OC000489.0090.001.002.800.870.0052.50
OC000490.0091.001.002.781.000.0052.50
OC000491.0092.001.002.771.070.012.50
OC000492.0093.001.002.791.030.0052.50
OC000493.0094.001.002.914.040.0129.71

Quality Assurance & Quality Control (QA/QC):

All sample assay results have been monitored through the Company’s quality assurance/quality control (QA / QC) program following E2941 − 21 Standard Practices for Extraction of Elements from Ores and Related Metallurgical Materials by 4 acid Digestion with ICPOES finish. Drill core was sent to an independent laboratory, African Laboratory Specialists Namibia (“ALS”), for analysis. ALS is an independent laboratory, located in Kombat, Namibia. Core samples were prepared using the ASTM procedures. Sample size: 3 kg, crushed split to 250g weighed sample (+/- 0.5000g).

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101.

Renmark Financial to Host Virtual Non-Deal Roadshows Next Month

Trigon will be participating in a live Virtual Non-Deal Roadshow session on Wednesday, June 14, 2023. Trigon welcomes stakeholders, investors, and other individual followers to register and attend this live event.

Jed Richardson, President and Chief Executive Officer, and Aidan Sullivan, Vice-President, Investor Relations will walk viewers through the latest investor presentation followed by a live Q&A. Investors interested in participating in this event will need to register using the link below. As a reminder, registration for the live event may be limited but access to the replay after the event will be on the Trigon website.

REGISTER HERE:
Wednesday, June 14, 2023 at 2:00 PM ET:
https://www.renmarkfinancial.com/events/renmark-virtual-non-deal-roadshow-tsx-v-tm-otcqb-pntzf-2023-06-14-120000

Please access this link using the latest version of Google Chrome to ensure smooth connectivity.

Trigon Metals Inc.

Trigon is a publicly traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine. In Morocco, the Company is the holder of the Silver Hill project, a highly prospective copper and silver exploration project.

Cautionary Notes

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements. These statements include statements regarding the Project, the mineralization of the Project, the Company’s exploration plans and results thereof, the prospectivity of the Project, the economic viability of the Project, the Company’s ability to restart operations and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

Contacts

For further information, contact:
Jed Richardson
+1 647 276 6002
jed.richardson@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2023, News Tagged With: press releases, kombat mine

PDF Download

Trigon Metals Restarts Mining at Kombat Copper Project Ahead Of Schedule

10 May 2023 by trigonmetals

TORONTO — May 10, 2023 — Trigon Metals Inc. (TSX-V: TM; OTCQB: PNTZF) (“Trigon” or the “Company”) is pleased to announce, as of yesterday, May 9, 2023, a successful first mining blast and the official restart of mining operations from its Kombat mine open pit, ahead of initial projections.

Trigon President and CEO, Jed Richardson, commented: “I would like to thank our staff, contractors, suppliers, local partners and the Namibian government for their efforts in getting Kombat back into production after our pause in July 2022. This is an important milestone for our Company and the Kombat community. We are excited to begin production and look forward to the continued growth of our operations at Kombat.”

Video footage of the first blast is viewable at the following link: https://www.youtube.com/watch?v=kjoMYDWkW2k

Now that mining has commenced, ore will be stockpiled at the mill. First concentrate shipments are anticipated in fiscal Q2. Copper production of 4.4 million pounds is anticipated from the open pit by March 31, 2024 (fiscal year end), growing to 6.8 million pounds in our first full year of production. The next quarter is expected to also mark the beginning of water pumping from underground in anticipation of reopening underground mining in 2024.

The Kombat Mine

The Kombat Mine is currently the only operating commercial copper mine in Namibia. Mining operations originally commenced in 1962, having produced a total output of 12.5 million tonnes of ore grading 2.6% copper on average until 2008. The mine still boasts NI 43-101 measured and indicated open pit and underground resources of an additional 12.2 million tonnes at an average grade of 1.9% copper. Exploration potential exists close to existing workings at surface and underground, alongside 35km of mineralized strike-length Trigon has yet to explore.

The inherited mine infrastructure has an estimated value of more than USD $150 million, including; a mill that can process 1,100 tonnes/day, an 800m shaft with two other vertical shafts, extensive underground workings, a tailings facility, ramp systems, mine buildings and concentrator.

Qualified Person

The technical information presented in this press release has been reviewed and approved for disclosure by Fanie Müller, P.Eng, VP Operations of Trigon, who is a Qualified Person as defined by NI 43-101.

Trigon Metals Inc.

Trigon is a publicly traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently, the company has operations in Namibia and Morocco. In Namibia, the Company holds an 80% interest in five mining licences in the Otavi Mountainlands, an area of Namibia widely recognized for its high-grade copper deposits, where the Company is focused on exploration and re-development of the previously producing Kombat Mine. In Morocco, the Company is the holder of the Silver Hill project, a highly prospective copper and silver exploration project.

Cautionary Notes

This news release may contain forward-looking statements. These statements include statements regarding the Project, the mineralization of the Company’s projects, the Company’s exploration plans and results thereof, the prospectivity of the Kombat mine, the economic viability of the Kombat mine, the Company’s ability to restart and continue operations and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

Contacts

For further information, contact:
Jed Richardson
+1 647 276 6002
jed.richardson@trigonmetals.com
Website: www.trigonmetals.com

Filed Under: 2023, News

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 9
  • Go to page 10
  • Go to page 11
  • Go to page 12
  • Go to page 13
  • Interim pages omitted …
  • Go to page 31
  • Go to Next Page »

Footer

  • Home
  • Corporate
  • Assets
    • Addana Project
    • Silver Hill Project
    • Kalahari Copper Project
  • Investors
    • Overview
    • Stock Information
    • Corporate Presentation
    • Reports & Filings
    • IR Contact
  • News & Press Releases
  • Contact
    • facebook
    • twitter
    • instagram
    • linkedin
    • youtube

Copyright © 2025 Trigon Metals. All Rights Reserved.